|
|
Youths patching up a space for water to pass through along the side
|
Youths showing some materials (cement
& pvc pipes) bought to construct the
fishpond and the water way.
|
|
|
Titus (left) unloading sand
with the truck driver
|
Youths get help carrying
sand to the pond site |
|
|
Titus presenting the
project to the community
|
Engaged carpenters doing the final
touches before fillng the pond with water |
|
|
Youths at work digging
the large pond |
|