Durée du projet - Calendrier

© Archivo del Centre d’Arqueologia Subaquàtica de Catalunya
The Wreck Sorres X (14th century) sunk in the Canal de Remo Olímpico de Castelldefels, Barcelona, Spain. This is a rare case of a ship with both types of rudders: axial rudder (side rudder a.k.a. quarter rudder) and lateral rudder (stern rudder). It was discovered during the construction works of the Olympic channel of Castelldefels in 1990. After preparatory work, it was excavated between 1990 and 1991 under the direction of A. Martín. The project report was published in 1992. The efficient and timely completion of this project from preparatory work to publication was achieved through rigorous planning and accurate implementation of the project design.

Fixer un calendrier pour l’ensemble d’un projet aussi bien que pour chacune de ses phases individuelles et de ses activités est un élément fondamental d’un descriptif de projet de bonne qualité.

Un calendrier est un moyen essentiel de fixer les objectifs et les activités d’un projet dans un programme réalisable en fonction des ressources disponibles.

 

 

Exemple de diagramme de Gantt illustrant la structure de répartition du travail du projet (en anglais)

Les arguments de ce chapitre sont :

  • Le calendrier du projet (Règle 20)
  • Durée du projet
  • Plan d'urgence (Règle 21)

 